Once the concrete cured, and we waited through winter it was time to start on the construction in earnest (and a little more demolition).  These pics are not quite in order, but close enough.

Here are the stairs once the plastic came off.







Brennan took his turn with the jackhammer.

Brady too!  We were removing the hot tub pad.
.



Opposite wall with siding installed on interior.


Roofing being delivered.
First walls going up.

Looking up at the new patio once roofing was installed.
Far wall going in.


The outside pre-siding,Next up is the ceiling install and the exterior siding.