Once the concrete cured, and we waited through winter it was time to start on the construction in earnest (and a little more demolition). These pics are not quite in order, but close enough.
| Here are the stairs once the plastic came off. |
| Brennan took his turn with the jackhammer. |
| Brady too! We were removing the hot tub pad | . |
| Opposite wall with siding installed on interior. |
| Roofing being delivered. |
| Looking up at the new patio once roofing was installed. |
| Far wall going in. |
| The outside pre-siding,Next up is the ceiling install and the exterior siding. |
No comments:
Post a Comment